Submitted by DeusQain on Sat, 05/19/2018 - 02:19
Back in Vault29Alpha after traveling on a project for the last couple months.
Currently working on a magnetic locking mechanism for the Vault Door.
Artwork and Deskmats acquired from Peter Mohrbacher at Angelarium
https://angelarium.net
Use Coupon Code QAINSWORLD for $5 off your order
Special thanks to Level1techs.com
Submitted by DeusQain on Sat, 05/19/2018 - 02:10
Furthering the adventures in the vault, I discuss audio issues, and talk about topics in the pipeline. To the future.
Submitted by DeusQain on Sat, 05/19/2018 - 02:03
Finally got the 10 Gigabit Ethernet upgrades complete.
Firewall's inside interface is now running on a Chelsio 10Gbe card.
Submitted by DeusQain on Sat, 05/19/2018 - 02:02
Can't have a data center, without some cables, to transmit that data on. Ran some cable, and connected my switch stack to my server rack.
Submitted by DeusQain on Sat, 05/19/2018 - 01:55
More Dell equipment! Force10 S60 switch, with four 10Gbps SFP+ ports. Preparations and installation of 10Gbps network switch and Mellanox 10G network cards into the Vault's data center.
Submitted by DeusQain on Sat, 05/19/2018 - 01:54
Back from New York, had an eventful week, met up with some infosec folk. I'm back in the vault, working on the network, and virtual environments. My storage systems are primed and ready for use.
Submitted by DeusQain on Sat, 05/19/2018 - 01:52
Other than needing to upgrade my switch to something manageable with more ports, the server stack is as together as it will be for now. Proxmox with Docker is installed on the R715 I got from Level1Techs. It has dual socket 12 core AMD Opterons.
Submitted by DeusQain on Sat, 05/19/2018 - 01:21
Cover a short preview of things to come, and a little tour of the progress on Vault 29Alpha
Stay tuned.
Submitted by DeusQain on Sat, 05/19/2018 - 01:18
A quick update between editing and organizing Vault29Alpha.
A short overview of my PS2 Linux project, and a short tour of the Vault.
Submitted by DeusQain on Sat, 05/19/2018 - 01:15
Workstation almost done, need to re-arrange some things on the shelf, and put up some more art. Then I shall begin streaming and I will also begin working through my long list of videos that I have been outlining over the last several months.
Pages